Recent Cobra updates

The Portal

The Intelligence Hub for the Victory of Light

Sunday, August 1, 2021

STATE OF MISSION REPORT JULY 2021

Pandora in progress, PBS security breach deflection in completion, PB / systems security breach. M signal field substable, wipeout sequence 8 in progress, wipeout sequence 7 complete. Minimum M / DL / HP / SD requirements met, VTX and MDS requirements not met. 
Posted by Cobra at 1:23 PM
114 comments

MDS failure
Posted by Cobra at 4:21 AM
51 comments

GAL hack / failure
Posted by Cobra at 12:43 AM
26 comments

Saturday, July 31, 2021

SecureShell activated
Posted by Cobra at 11:37 PM
28 comments

PB security breach / systems security breach / black alert at 504, grid ratio failure
Posted by Cobra at 11:36 PM
11 comments

Tuesday, July 27, 2021

Inflection Point

 1789.54/2021.72

A second basement DOES exist, although the waitress denied it
Posted by Cobra at 3:58 AM
406 comments:
Labels: Project 83

Wednesday, July 21, 2021

 L2 subsequence complete
Posted by Cobra at 3:24 AM
314 comments
Older PostsHome

One thought on “Recent Cobra updates

  1. Pingback: Recent Cobra updates — Forever Unlimited – yazım'yazgısı (typography)

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s